BACKYARD OFFICE REQUIREMENTS:
Permit Restrictions
Planning and building departments must be advised of the building plans where they will then make a decision if a permit is required
The addition of a deck, overhang, and slab foundation would likely trigger a permit
The addition of electricity would require a electrical permit
Setback and Height Restrictions
Height max: ??
Setback Requirements ***???
Front property line: 40 feet
Side property line: 30 feet
Rear property line: 30 feet
ADU REQUIREMENTS:
Zoning Restrictions
All existing single-family homes in the R-A (Residential Agricultural) District are permitted to have ADUs
Setback and Height Restrictions
Setback Requirements:
Side lot: 4 feet
Rear lot: 4 feet
Front lot: 30 feet
Any existing structure: 6 feet
Height maximum:
Detached ADU: 16 feet
If the detached ADU has a rear and side setback of 30+ feet and an additional parking spot, the height max can be increased to 19 feet
Other Restrictions
Homeowners might be required to sign a document prohibiting short-term rentals < 30 days